Introduction
The Solid Control System For Offshore is a complete set of solids control equipment designed for the treatment of drilling fluids in offshore environments, suitable for both offshore oil and gas drilling and well intervention operations.
Parameter
|
Model |
SXJ135 |
SXJ180 |
SXJ225 |
|
System effective capacity |
100m³(620bbl) |
100m³(620bl) |
160m³(1000bbl) |
|
Rated pressure ,mud line |
0.5Mpa(72.5psi) |
0.5Mpa(72.5psi) |
0.5Mpa(72.5psi) |
|
Total installed power |
100kw(135hp) |
320kw(430hp) |
320kw(430hp) |
|
Capacity,mud weighting system |
200m³/h (7063 ft³/h) |
200m³/h (7063 ft³/h) |
200m³/h (7063 ft³/h) |
|
Capacity ,solid control equipment |
40-50L/S (640-800GPM) |
40-50L/S (640-800GPM) |
40-50L/S (640-800GPM) |
|
Shale shaker |
GJZS-1 |
GJZS-1 |
Derrick FLC-2000 |
|
Combo of shaker/desander/desilter |
|
GJZS-1 |
Derrick FLC-2000 |
|
Vacuum degasser |
|
ZCQ-200P |
ZCQ-200P |
|
Centrifugal |
SBX8''-12.5X1 |
LW450-1000N2 |
LW450-1000N2 |
|
Sand pump |
|
SBX8''-12.5''X3 |
SBX8''-12.5''X3 |
|
Trip pump |
|
SBX4''-9.5''X2 |
SBX4''-9.5''X1 |
|
Mixing hopper |
SL-200 |
SL-200 |
SL-200 |
Video
Features of Solid Control System For Offshore
Offshore Corrosion Resistance
The Solid Control System for Offshore uses a 316L stainless steel frame with epoxy zinc-rich coating, ensuring stable 3–5 year operation in high-salinity marine environments and reducing corrosion-related damage.
Solid-Liquid Separation Efficiency
The system integrates shale shaker, desander, desilter, and centrifuge, improving solids removal efficiency by about 25% and reducing drilling fluid loss.
Continuous Operation Stability
Built with industrial-grade bearings and wear-resistant screens, the system supports over 8,000 hours of continuous operation, minimizing offshore downtime and maintenance needs.
Rapid Installation Advantage
The skid-mounted modular design allows full pre-assembly, reducing on-site installation time by approximately 40% compared with conventional systems.
Customization
|
Item |
Description |
|
Processing Capacity |
Processing capacity and equipment configuration can be customized according to drilling fluid flow requirements. |
|
Modular Structure |
Module dimensions and equipment layout can be adjusted based on offshore platform space constraints. |
|
Control System |
Can integrate PLC systems from different brands and remote monitoring functional modules. |
|
Power Configuration |
Various drive and power supply solutions can be matched according to voltage standards and power requirements. |
FAQ
Q: Can I take a virtual tour of your factory?
A: Certainly. We can show you our workshops, warehouses, and offices via video.
Q: What are the primary functions of the Offshore Solids Control System?
A: The Offshore Solids Control System is designed for the solid-liquid separation and circulation purification of drilling fluids in offshore drilling operations, ensuring the fluid maintains stable performance and minimizing the accumulation of solid impurities.
Q: Under what operating conditions is it applicable?
A: It is suitable for use in the drilling fluid circulation and purification systems of offshore drilling platforms and oil and gas well workover operations.
Q: What is the Minimum Order Quantity (MOQ)?
A: We accept orders for a single complete unit; alternatively, the system can be purchased as separate modules or combined configurations to meet the specific requirements of different projects.
Q: What is the delivery lead time?
A: The standard lead time is approximately 30–60 days, though the exact duration may vary depending on the complexity of the configuration and any specific customization requirements.
Q: What payment methods are accepted?
A: We typically accept staged payments via T/T (Telegraphic Transfer); the specific payment structure can be adjusted based on the nature of the business cooperation.
Q: Which trade terms are supported?
A: We support various international trade terms-such as FOB, CIF, and EXW-to accommodate the procurement processes of clients in different regions.
Q: How is the system packaged and transported?
A: The system is packaged using a combination of modular steel frame fixation, protective film wrapping, and reinforced wooden crating, making it suitable for maritime shipping.
Q: Is the installation process complex?
A: The Offshore Solids Control System features a skid-mounted structural design; upon arrival at the site, the system requires only the completion of piping and electrical connections to become fully operational.
Certificate
Our company has obtained API Q1 certification and authorization to use the API Monogram, and has successfully passed the ISO 9001, ISO 14001, and ISO 45001 management system certifications.






Hot Tags: solid control system for offshore, China solid control system for offshore manufacturers, suppliers, factory, Solid Control System For Offshore, Drilling Mud Tank, Drilling Centrifugal Pump, Diamond PDC Drill Bit, Mud Gas Separator, Mud Mixing Hopper

